Pronimen – Projects

Infrastructure and Installations products, engineered, manufactured, and delivered direct from the factory.

Example 1

B.T. Steel Capping

4 X Steel Capping Samples

1 = 1.5mm thickness “plain surface” 10% less expensive
2 = 1.5mm thickness “flakey surface” 15% less expensive (pronimen)
3 = 1.8mm thickness “rough to touch” +15% (brand)
4 = 1.6mm thickness “rough to touch”
Pronimen (2) = pre-galvanised  steel+Z275 2400 mm long x 76 mm wide, pre drilled verses branded – client saving approximately 20-30% = £100K+

Example 2

UPB – High Strength

Universal Pole Bracket High Strength, Polished

180 degrees horizontal pulling test – maximum tension force 23.70 KN 18 degrees diagonal pulling test – maximum tension force 21.55 KN
Pronimen Universal pole bracket is made of high strength aluminium alloy and, highly polished ease of fitting and installation on all types of poles etc. – client saving minimum 20% = £80K+

Example 3

Grip Stay

GRIP STAY ANCHOR Preformed Suspension Tension Clamps for Fibre Drop ADDS Cables

Also known as an end clamp – Used primarily as a terminator for fibre ADSS drop cables, power, copper and wire.
Pronimen grip stay anchor is a bespoke product precision made to exacting measurements, from high strength galvanised steel – client saving minimum 23% = £40K+

Example 4

Project PRE-TERM – Design, manufacture and delivery of 2 core fibre G657A2 (high core grade) UG drop cable with caa jacket for 48,000 Government Military Residences.

  • Project Gestation: 1 month to design and build prototype/samples
  • Project Duration: 2 year project

Example 5

Project DSLAM – Design, manufacture and delivery of 32 channel subscriber cable for large European Telco Operator

  • Project Gestation: 1 month to design and build prototype/samples
  • Project Duration: 2 year project

Example 6

Project PRE-TERM – Design, manufacture and delivery of 250000 pre-terminated bespoke fibre patch cords

  • Project Gestation: 1 month to design and build prototype/samples
  • Project Duration: 2 year project

Example 7

Project BT – Design, manufacture and delivery of BT3002, CW1308, + Fibre Installation Cables

  • Project Duration: 3 years

Operator Projects

Projects From Around The World.

BT 21st CN

Sourced, designed and manufactured private label BT3002 specialist copper cable directly on behalf of British Telecom England.

Project Value – £21 Million GBP

Fulfilled

ETISALAT

Sourced, designed and manufactured private label specialist copper cable directly on behalf of Etisilat Abu Dhabi, United Arab Emirates.

Project Value – £3 Million GBP

Open

EIRCOM

Sourced, designed and manufactured private label DLSAM assemblies, and installation equipment directly on behalf of Eircom Ireland.

Project Value – £1 Million GBP

Fulfilled

N.B.I

Sourced, designed and manufactured private label 5G telco accessories and installation equipment directly on behalf of NBI Ireland.

Project Value – £1 Million GBP

Open

CLOSURES

Designed and manufactured own and private label fibre closures for major telco operator.

Project Value – £1 Million GBP

Open – Ongoing

MINING CABLE

Designed and manufactured bespoke own label specialist armoured fibre cable for mining facility.

Project Value – £50K GBP

Open – Ongoing

We Will Build It

Concept To Completion

World Class Facilities

Let Us Breath Life Into Your Ideas!

What do you need?

  • A one off quote?
  • A one off product?
  • Multiple product items on a BOM (Bill of Materials)?
  • Does your requirement need designed?
  • Does it require reverse engineered?
  • Is your requirement an off the shelf item?
  • Is your requirement ongoing?
  • Do you have a regular order with regular drops?
  • Do you need shipping, payment terms, etc?

All these questions and more can be answered with our quick engagment processs.

Chat with us now using the instant chat at the bottom right of your screen.

Alternatively, message us using the below contact form and we will get back to you ASAP.
Project Currency